Marmoleum Flooring Installation Instructions

Marmoleum flooring installation instructions.
Marmoleum flooring installation instructions. Clear descriptions and manuals are available for download to assure a correct installation of our Marmoleum floorings. Use Forbo L 885 Sustain. The tolerance in the sequence of carton numbers should not exceed 100.
Store Marmoleum tiles in cartons stacked maximum 5 cartons and laying flat. Marmoleum Click can be installed on any clean dry structurally sound sub- floor. Marmoleum Modular and MCT in the square format have a directional pattern and should be installed in alternating directions quarter turned.
The installation of Marmoleum Sheet should be carried out in accordance with the national code of practice for the installation of resilient floor coverings if applicable. After adhering immediately roll the flooring in both directions using a 100 pound roller. Install tiles into wet adhesive and roll with a 100 pound roller before the adhesive has dried.
Always check for proper adhesive transfer. Areas to receive flooring should be clean free from other trades fully enclosed and weather tight. The finest floor covering made will not look good nor perform well if it is not installed properly.
Marmoleum Click can be installed by placing the tongue into the groove as well as the groove into the tongue however it is easier to work so that you are placing the tongue into the groove. Install cartons in consecutive order. Areas to receive flooring should be clean fully enclosed and weathertight.
Subfloors should be clean smooth sound and permanently dry. Creating better environments Installation Guidelines. Always conduct moisture tests on all substrates.