Engineered Flooring Installation Instructions

Secure underlayment material as necessary to prevent excessive movement.
Engineered flooring installation instructions. Installing a Nail-Down Engineered Hardwood Floor Step 1. Videos you watch may be. Please refer to the Installation Application Methods Chart to determine suitable applications for CRAFT Engineered Hardwood Flooring.
Check the flatness using a straight edge laser line or string line. CRAFT Engineered Hardwood Flooring can be installed on above or below grade. Floating floors can be installed over any structurally sound concrete.
All subfloors should be covered with Shaw Silent Step 3 in 1 or 2 in 1 Underlayment or an approved foam underlayment. If present remove by grinding or sanding. Acclimation allows flooring to achieve equilibrium moisture.
If playback doesnt begin shortly try restarting your device. Apply a moisture barrier to slab. Its important to check Adhesive Manufacture for correct Adhesive and Trowel according the subfloor and flooring products.
Make sure properly test subfloor before installation following subfloor preparation instructions previously aforementioned. When installing over existing wood flooring install at right angles to the existing floor. The floor must be completely covered to eliminate uneven ambering from exposure to UV light.
Find this diagram after last page of this document Installation Instructions for Engineered Flooring Page 1 of 11. The seams of the 6-mil poly should overlap 4 to 6 and should be taped to the foundation walls using an aggressive tape such as Duck tape. Per NWFAJohnsonʼs recommendations it is generally recognized when installing engineered wood.