Armstrong Vct Flooring Installation Instructions

Outlines substrates job conditions fitting adhesives trowel notchings and step-by-step installation instructions.
Armstrong vct flooring installation instructions. Carefully review the detailed instructions for your flooring to learn what youll need and what to expect. Allow all flooring materials and adhesives to condition to the room temperature for a minimum of 48 hours before starting the installation. Roll floor in both directions with a 100 pound three-section roller.
Place another full tile B on top of tile A with its edge against the wall. Inspired by nature and PVC-free Striations BBT was carefully curated to coordinate with Migrations BBT. Do this well in advance.
If you prepped the area by pulling the shoe molding and then undercut your jambs reach down and sweep your hand across the surface. Resilient flooring should only be installed in temperature-controlled environments. Armstrong Vct Flooring Installation Instructions.
This comprehensive guide to armstrong flooring installation provides all the information needed to properly install armstrong vct and ensure it will look great and perform exactly as it should. Post Installation Floor Protection. Sign up to receive product updates installation maintenance tips news and more.
Mark the floor at each end of the court directly under the center of the front edge of each goal by using a plumb bob and snap a chalk line through these points. Many will vacuum up a floor and call things good. This document can be.
Do not install over expansion joints. If playback doesnt begin shortly try restarting your device. Using tile B as a guide mark the face of tile A with a pencil.